Current News


Baku Islamic Games 2017

Ed Sheeran Divide Tour 2017 -2018

New Office

Roger Waters 2016

Rio Olympic Ceremonies 2016



Archive News


2017 | Jan |May |Jun |

2016 | Mar |Jul |Aug |Oct |

2015 | Apr |May |Jun |

2014 | Mar |Apr |Aug |Sep |Nov |

2013 | Mar |Jun |Aug |Sep |Nov |

2012 | Aug |Dec |

2010 | Oct |

Glasgow 2014


Piers Shepperd worked as Technical Director for the Glasgow 2014 Handover Ceremony. Piers worked with Designers Mark Fisher and Jeremy Lloyd to deliver the centrepiece to the performance – a 17m high and 30.5m long inflatable replica of the Clyde Auditorium, affectionately known as the “Armadillo”. The replica “Armadillo” is made out of 4,500 square metres of high tenacity nylon fabric and was inflated and managed by 16 cast members using powerful backpack “leaf blowers” with ultra high air throughput. The inflatable was designed using the building’s architectural drawings and then modelled in 3D where it underwent rigorous testing for wind.